24-hour TSP Monitoring Results
Location CM_AB1b - Works Site Boundary of Aberdeen PTW
Start Date Start Time Weather Air Atmospheric  Filter Weight (g)   Particulate Elapse Time   Sampling Flow Rate (m3/min.)   Av. flow Total vol. Conc. Filter
Condition Temp. (K) Pressure, Pa (mmHg) Initial Final Weight (g) Initial Final  Time(hrs.) Initial Final (m3/min) (m3) (µg/m3) ID no.
1-Jun-15 09:00 Cloudy 302.8 758.7 3.2679 3.3602 0.0923 3827.1 3851.1 24.0 1.21 1.21 1.21 1747.1 52.8 150405/037
5-Jun-15 09:00 Sunny 304.3 757.5 3.2449 3.3555 0.1106 3851.1 3875.1 24.0 1.21 1.21 1.21 1741.1 63.5 150501/099
12-Jun-15 16:00 Sunny 305.5 757.5 3.2284 3.2843 0.0559 3875.1 3899.1 24.0 1.21 1.21 1.21 1737.5 32.2 150502/042
17-Jun-15 09:00 Sunny 303.5 757.5 3.2709 3.3906 0.1197 3899.1 3923.1 24.0 1.21 1.21 1.21 1743.5 68.7 150502/051
23-Jun-15 09:00 Sunny 302.4 755.7 3.2916 3.3816 0.0900 3923.1 3947.1 24.0 1.21 1.21 1.21 1744.7 51.6 150504/075
2-Jul-15 16:30 Sunny 306.7 753.3 3.2794 3.3869 0.1075 3947.4 3971.4 24.0 1.20 1.20 1.20 1729.9 62.1 150505/071
Min 32.2
Max 68.7
Average 55.2
Remarks:
1. 24-hour TSP monitoring at CM_AB1b was rescheduled on 12 June 2015 due to the interruption of power supply of High Volume Sampler at CM_AB1b on 11 June 2015.
2. 24-hour TSP monitoring at CM_AB1b was rescheduled on 2 July 2015 due to the interruption of power supply of High Volume Sampler at CM_AB1b on 29 June 2015.