24-hour TSP Monitoring
Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Location
CM_AB1b - Works Site Boundary of Aberdeen PTW |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Start Date |
Start
Time |
Weather |
Air |
Atmospheric |
Filter Weight (g) |
|
Particulate |
Elapse Time |
|
Sampling |
Flow Rate (m3/min.) |
|
Av. flow |
Total vol. |
Conc. |
Filter |
Condition |
Temp. (K) |
Pressure, Pa
(mmHg) |
Initial |
Final |
Weight (g) |
Initial |
Final |
Time(hrs.) |
Initial |
Final |
(m3/min) |
(m3) |
(µg/m3) |
ID no. |
1-Jun-15 |
09:00 |
Cloudy |
302.8 |
758.7 |
3.2679 |
3.3602 |
0.0923 |
3827.1 |
3851.1 |
24.0 |
1.21 |
1.21 |
1.21 |
1747.1 |
52.8 |
150405/037 |
5-Jun-15 |
09:00 |
Sunny |
304.3 |
757.5 |
3.2449 |
3.3555 |
0.1106 |
3851.1 |
3875.1 |
24.0 |
1.21 |
1.21 |
1.21 |
1741.1 |
63.5 |
150501/099 |
12-Jun-15 |
16:00 |
Sunny |
305.5 |
757.5 |
3.2284 |
3.2843 |
0.0559 |
3875.1 |
3899.1 |
24.0 |
1.21 |
1.21 |
1.21 |
1737.5 |
32.2 |
150502/042 |
17-Jun-15 |
09:00 |
Sunny |
303.5 |
757.5 |
3.2709 |
3.3906 |
0.1197 |
3899.1 |
3923.1 |
24.0 |
1.21 |
1.21 |
1.21 |
1743.5 |
68.7 |
150502/051 |
23-Jun-15 |
09:00 |
Sunny |
302.4 |
755.7 |
3.2916 |
3.3816 |
0.0900 |
3923.1 |
3947.1 |
24.0 |
1.21 |
1.21 |
1.21 |
1744.7 |
51.6 |
150504/075 |
2-Jul-15 |
16:30 |
Sunny |
306.7 |
753.3 |
3.2794 |
3.3869 |
0.1075 |
3947.4 |
3971.4 |
24.0 |
1.20 |
1.20 |
1.20 |
1729.9 |
62.1 |
150505/071 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Min |
32.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Max |
68.7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Average |
55.2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Remarks: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. 24-hour
TSP monitoring at CM_AB1b was rescheduled on 12 June 2015 due to the
interruption of power supply of High Volume Sampler at CM_AB1b on 11 June
2015. |
|
|
2. 24-hour
TSP monitoring at CM_AB1b was rescheduled on 2 July 2015 due to the
interruption of power supply of High Volume Sampler at CM_AB1b on 29 June
2015. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|